Project 1: Foundation Engineering

shovel the wall skin (gypsum ash) 960.00

wall blank base treatment 914.00

wall/ground cement mortar leveling 2097.54

seal the door head 288.00

door pocket base (joinery board) 270.00

remove the brick wall (240 mm) 276.00

remove the original doors and windows and 55.00

light brick wall (240 mm double-sided plastering) 512.00

. opening after removing the wall Whitewash 600.00

masonry wall opening 236.80

removal of thermal insulation wall 2385.00

closure hole 200.00

repair after removal of thermal insulation wall 1200.00

Project II: Waterway and circuit engineering

strong and weak current construction (lump sum price) 6160.00

waterway construction (lump sum price) 1550.00

strong Installation of weak current box 100.00

change down pipe 592.00

change down pipe 283.50

balcony water outlet 300.00

Project III: guest restaurant and aisle

latex paint base treatment (putty) 2108.20

latex paint 843.28

gypsum board modeling ceiling 402.50

gypsum line 910.00